Reports
Previous Study Reports
Highway 6 (Hanlon Expressway) Improvements from 0.5 kilometres south of Maltby Road to the Speed River, Transportation Environmental Study Report (G.W.P. 3002-05-00), June 2009
The Highway 6 (Hanlon Expressway) Improvements Transportation Environmental Study Report (TESR) was completed in June 2009 , and documented the EA process, consultation efforts, recommended plan, and commitments for the future stages of design.
Please use the link below to download the 2009 TESR for your reference:
G.W.P._3002-05-00 Hwy6-HanlonExpressway Improvements TESR, June 2009
- Appendix A
- Appendix B
- Appendix C
- Appendix D
- Appendix E
- Appendix F
- Appendix G
- Appendix H
- Appendix I
- Recommended Plan
Highway 6 (Hanlon Expressway) Interchange at Laird Road, Design and Construction Report (G.W.P. 3002-05-00), June 2011
A Design and Construction Report (DCR) was prepared to document the detailed design of a new interchange at Highway 6 (Hanlon Expressway) and Laird Road in June 2011.
Click on the link below to download the 2011 DCR:
Additional reports will be provided here as they are completed during the current study.